2025 - 2026
Final Customer
Safety
TECUNI (Grupo VINCI)
Definition of the methodology and conduct of the necessary safety studies to ensure compliance with safety requirements and the implementation of optimal preventive measures for the correct installation of the various pieces of equipment that will make up the prototype plant, namely the hydrogen supply circuit, the blending with natural gas, and its subsequent use for combustion. This ensures the protection of the people involved, the facilities and the surrounding environment.
The aim is to take all safety measures into account so that the tests can be carried out as safely as possible.
Based on the information received, an in-depth analysis is conducted using relevant standards and regulations, as well as risk analysis methodologies, all of which are applied to hydrogen environments.
The results obtained following the study of the hydrogen facilities and the safety analysis will be as follows:
1. ATEX zoning in the vicinity of the facilities.
2. Safety distances for the installation of equipment.
3. Risk metrics based on a quantitative risk analysis.
The facilities that process or store hydrogen and are therefore included within the scope of the project are as follows:
• Pressurised hydrogen storage
• Storage pressure relief ramp
• H₂ + NG blending skid
• Internal gas ramp
Regulation:
Methodology: